BEGIN:VCALENDAR
CALSCALE:GREGORIAN
METHOD:PUBLISH
PRODID:-//github.com/ical-org/ical.net//NONSGML ical.net 4.0//EN
VERSION:2.0
X-WR-TIMEZONE:US/Eastern
BEGIN:VEVENT
CATEGORIES:Environment
CATEGORIES:Stormwater
CATEGORIES:Streams
CATEGORIES:T&ES Events
DESCRIPTION:Imported on Nov 12\, 2026\, 7 days before the event.\nTo verif
 y info please see https://apps.alexandriava.gov/Calendar/Detail.aspx?si=6
 3756\n\nFollowing previous community discussions and further project eval
 uations\, the City has significantly reduced the extent of the proposed e
 ngineered improvements and anticipated construction impacts. The revised 
 design reflects these changes and will be presented at the upcoming meeti
 ng. \n\nThe updated 60% design plans and accompanying report are now avai
 lable for review on the City's project website. Community members are enc
 ouraged to review the materials before the meeting. \n\nLocation: 2900 Bu
 siness Center Drive\nContact Person: Camille Liebnitzky\nContact Phone: 7
 03.746.4089\nContact Email: camille.liebnitzky@alexandriava.gov\nTags: En
 vironment\, Stormwater\, Streams\, T&ES Events\n\nWeb resources:\n\nCity 
 Website\nhttps://www.alexandriava.gov/capital-projects/project/taylor-run
 -infrastructure-stabilization-project\n\nRegistration Link\nhttps://alexa
 ndriava.zoom.us/webinar/register/WN_nhHrGAP6QYOfzjFd5Kf5Pg?jcs=calendar-z
 w-pcBrw#/registration \nZoom Link for Registration\n\nTaylor Run Infrastr
 ucture Stabilization  60%  Community Feedback Form\nhttps://app.smartshee
 t.com/b/form/01a1c5f3c2f57d93849762c6ecfa33c6\n
DTEND:20261120T010000Z
DTSTAMP:20261112T155738Z
DTSTART:20261119T233000Z
LOCATION:2900 Business Center Drive
SEQUENCE:7
STATUS:CONFIRMED
SUMMARY:Taylor Run 60% Design Community Meeting
TRANSP:OPAQUE
UID:218a3bea-9c45-48e5-b7cb-e57087d7a123
URL:https://www.alexandriava.gov/capital-projects/project/taylor-run-infra
 structure-stabilization-project
X-ALT-DESC;FMTTYPE=text/html:Imported on Nov 12\, 2026\, 7 days before the
  event.<br />To verify info please see <a href="https://apps.alexandriava
 .gov/Calendar/Detail.aspx?si=63756">https://apps.alexandriava.gov/Calenda
 r/Detail.aspx?si=63756</a><br />\n<br />Following previous community disc
 ussions and further project evaluations\, the City has significantly redu
 ced the extent of the proposed engineered improvements and anticipated co
 nstruction impacts. The revised design reflects these changes and will be
  presented at the upcoming meeting. \n<br />\n<br />The updated 60% desig
 n plans and accompanying report are now available for review on the City?
 s project website. Community members are encouraged to review the materia
 ls before the meeting. \n<br />\n<br />Location: 2900 Business Center Dri
 ve\n<br />Contact Person: Camille Liebnitzky\n<br />Contact Phone: 703.74
 6.4089\n<br />Contact Email: camille.liebnitzky@alexandriava.gov\n<br />T
 ags: Environment\, Stormwater\, Streams\, T&amp\;ES Events<br>\n<a href="
 https://www.alexandriava.gov/capital-projects/project/taylor-run-infrastr
 ucture-stabilization-project">City Website</a><br>\n<a href="https://alex
 andriava.zoom.us/webinar/register/WN_nhHrGAP6QYOfzjFd5Kf5Pg?jcs=calendar-
 zw-pcBrw#/registration ">Registration Link</a><br>\nZoom Link for Registr
 ation<br>\n<a href="https://app.smartsheet.com/b/form/01a1c5f3c2f57d93849
 762c6ecfa33c6">Taylor Run Infrastructure Stabilization  60%  Community Fe
 edback Form</a><br>\n
X-COA-DTSTAMP:20261112T155738Z
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Taylor Run 60% Design Community Meeting: Please visit website 
 to confirm time\, location\, etc.
DURATION:PT30M
REPEAT:2
TRIGGER:-PT30M
END:VALARM
END:VEVENT
END:VCALENDAR
