Main content
City of Alexandria Homepage
Saturday, August 30  •  85°Partly Cloudy Air Quality: Green
CloseWeather Forecast
Today: High 84° Low 72°
Partly CloudyAir Quality: Green
Sun: High 93° Low 73°
Partly CloudyAir Quality: Yellow
Mon: High 89° Low 72°
Scattered ThunderstormsAir Quality: Yellow
Tue: High 96° Low 74°
Mostly SunnyAir Quality: Yellow
Wed: High 91° Low 66°
Partly Cloudy
City of Alexandria, VA City of Alexandria, VA
  • By Date
  • By Board

Pennington (user 250) - Comments by Date

Time is a very expensive resource. I see mention of setting a timeline, but little mention of keeping to it, or revising it. At the micro level, meetings should not go on til 2.00am, at the macro level discussion should not go on until the project dies through boredom.

Pennington (250) | User | October 7, 2013 - 10:43 AM | Civic Engagement Handbook Comment Board

The EPC has a number of concerns but the three main issues are:
1) There needs to be a separation between pedestrians and cyclists on Beauregard. The hills will accentuate the speed that cyclists will be travelling at.
2) The City cannot afford to see its tree canopy diminish further. If good trees are to go, then there must be good mitigation elsewhere. This includes the site for the firehouse.
3) The EPC really questions the statement that the increase in population is not going to mean a corresponding increase in the school population.

Pennington (250) | User | May 1, 2012 - 5:40 PM | Beauregard Small Area Plan

The draft plan needs a section exploring the potential impacts on the Dora Kelly and Winkler Preserves with ideas to mitigate these effects. The two areas are too precious to leave to chance.

Pennington (250) | User | April 23, 2012 - 8:38 AM | Beauregard Small Area Plan

If the Task Force is to finish its task then it has got to avoid second guessing the City's technical staff. Questions about locating the flood mitigation pumping stations, and the permits required are not in the Task Force remit.If a particular subject is coming up on the next agenda, I strongly recommend the members read it up before the meeting in order to reduce time required to explain the issue.

Pennington (250) | User | August 10, 2011 - 5:07 PM | Waterfront Comment Board

Pennington (user 250) - Comments by Board

Beauregard Small Area Plan

The EPC has a number of concerns but the three main issues are:
1) There needs to be a separation between pedestrians and cyclists on Beauregard. The hills will accentuate the speed that cyclists will be travelling at.
2) The City cannot afford to see its tree canopy diminish further. If good trees are to go, then there must be good mitigation elsewhere. This includes the site for the firehouse.
3) The EPC really questions the statement that the increase in population is not going to mean a corresponding increase in the school population.

Pennington (250) | User | May 1, 2012 - 5:40 PM

The draft plan needs a section exploring the potential impacts on the Dora Kelly and Winkler Preserves with ideas to mitigate these effects. The two areas are too precious to leave to chance.

Pennington (250) | User | April 23, 2012 - 8:38 AM

Waterfront Comment Board

If the Task Force is to finish its task then it has got to avoid second guessing the City's technical staff. Questions about locating the flood mitigation pumping stations, and the permits required are not in the Task Force remit.If a particular subject is coming up on the next agenda, I strongly recommend the members read it up before the meeting in order to reduce time required to explain the issue.

Pennington (250) | User | August 10, 2011 - 5:07 PM

Civic Engagement Handbook Comment Board

Time is a very expensive resource. I see mention of setting a timeline, but little mention of keeping to it, or revising it. At the micro level, meetings should not go on til 2.00am, at the macro level discussion should not go on until the project dies through boredom.

Pennington (250) | User | October 7, 2013 - 10:43 AM