BEGIN:VCALENDAR
CALSCALE:GREGORIAN
DESCRIPTION:The Department of Transportation and Environmental Services (T
 &ES)\, Engineering Division invites residents to attend a public meeting 
 about the City's draft Sanitary Sewer Master Plan.  The Sanitary Sewer Ma
 ster Plan provides a summary of sanitary sewer assets and needs\, along w
 ith a plan to assess future wastewater flows corresponding to forecasted 
 growth.  The Sanitary Sewer Master Plan uses growth forecasts through bui
 ld-out conditions (post year 2040) to analyze hydraulic capacity of the c
 ollector sewers and interceptor sewers\, wastewater treatment plant capac
 ity\, and the impact of significant wet weather events on both the separa
 te sanitary and combined sewer systems.
METHOD:PUBLISH
PRODID:-//github.com/ical-org/ical.net//NONSGML ical.net 4.0//EN
SUMMARY:Sanitary Sewer Master Plan Public Meeting  on Dec 17\, 2012
VERSION:2.0
X-PUBLISHED-TTL:PT12H
X-WR-CALDESC:Sanitary Sewer Master Plan Public Meeting  on Dec 17\, 2012
X-WR-CALNAME:Sanitary Sewer Master Plan Public Meeting  on Dec 17\, 2012
X-WR-TIMEZONE:US/Eastern
BEGIN:VEVENT
CATEGORIES:Transportation
DESCRIPTION:To verify info please see https://apps.alexandriava.gov/Calend
 ar/Detail.aspx?si=5131\n\nThe Department of Transportation and Environmen
 tal Services (T&ES)\, Engineering Division invites residents to attend a 
 public meeting about the City's draft Sanitary Sewer Master Plan.  The Sa
 nitary Sewer Master Plan provides a summary of sanitary sewer assets and 
 needs\, along with a plan to assess future wastewater flows corresponding
  to forecasted growth.  The Sanitary Sewer Master Plan uses growth foreca
 sts through build-out conditions (post year 2040) to analyze hydraulic ca
 pacity of the collector sewers and interceptor sewers\, wastewater treatm
 ent plant capacity\, and the impact of significant wet weather events on 
 both the separate sanitary and combined sewer systems. \n\nLocation: Dura
 nt Center\, 1605 Cameron St.\nContact Person: Erin Bevis-Carver\nContact 
 Phone: 703.746.4154\nContact Email: Erin.Bevis-Carver@alexandriava.gov\nA
 udience: Anyone may attend\nTags: Transportation\n\nWeb resources:\n\nhtt
 p://alexandriava.gov/tes/info/default.aspx?id=51410\n
DTEND:20121218T020000Z
DTSTAMP:20130619T220000Z
DTSTART:20121218T000001Z
GEO:38.807761;-77.056990
LOCATION:Durant Center\, 1605 Cameron St.
SEQUENCE:8
STATUS:CONFIRMED
SUMMARY:Sanitary Sewer Master Plan Public Meeting
TRANSP:OPAQUE
UID:4db64eec-8ea8-417f-a558-e6764a3d9246
URL:http://alexandriava.gov/tes/info/default.aspx?id=51410
X-ALT-DESC;FMTTYPE=text/html:To verify info please see <a href="https://ap
 ps.alexandriava.gov/Calendar/Detail.aspx?si=5131">https://apps.alexandria
 va.gov/Calendar/Detail.aspx?si=5131</a><br />\n<br />The Department of Tr
 ansportation and Environmental Services (T&amp\;ES)\, Engineering Divisio
 n invites residents to attend a public meeting about the City?s draft San
 itary Sewer Master Plan.  The Sanitary Sewer Master Plan provides a summa
 ry of sanitary sewer assets and needs\, along with a plan to assess futur
 e wastewater flows corresponding to forecasted growth.  The Sanitary Sewe
 r Master Plan uses growth forecasts through build-out conditions (post ye
 ar 2040) to analyze hydraulic capacity of the collector sewers and interc
 eptor sewers\, wastewater treatment plant capacity\, and the impact of si
 gnificant wet weather events on both the separate sanitary and combined s
 ewer systems. \n<br />\n<br />Location: Durant Center\, 1605 Cameron St.\
 n<br />Contact Person: Erin Bevis-Carver\n<br />Contact Phone: 703.746.41
 54\n<br />Contact Email: Erin.Bevis-Carver@alexandriava.gov\n<br />Audien
 ce: Anyone may attend\n<br />Tags: Transportation<br>\n<a href="http://al
 exandriava.gov/tes/info/default.aspx?id=51410">http://alexandriava.gov/te
 s/info/default.aspx?id=51410</a><br>\n
X-COA-DTSTAMP:20121203T205238Z
END:VEVENT
END:VCALENDAR
