BEGIN:VCALENDAR
CALSCALE:GREGORIAN
METHOD:PUBLISH
PRODID:-//github.com/ical-org/ical.net//NONSGML ical.net 4.0//EN
VERSION:2.0
X-WR-TIMEZONE:US/Eastern
BEGIN:VEVENT
CATEGORIES:Sanitary Sewer System
CATEGORIES:Stormwater
CATEGORIES:Water
DESCRIPTION:Imported on Jun 26\, 2026\, 4 days before the event.\nTo verif
 y info please see https://apps.alexandriava.gov/Calendar/Detail.aspx?si=6
 3177\n\nJoin the City of Alexandria and AlexRenew for the christening and
  ribbon-cutting of the updated and rehabilitated pump station at the hear
 t of AlexRenew's wastewater treatment operations.\n\nLocation: AlexRenew 
 Education Center & Meeting Space \, 1800 Limerick Street\nContact Person:
  Bethany Latham\nContact Phone: 703.283.9813\nContact Email: bethany.lath
 am@alexrenew.com\nTags: Sanitary Sewer System\, Stormwater\, Water
DTEND:20260701T140000Z
DTSTAMP:20260618T205027Z
DTSTART:20260701T130000Z
LOCATION:AlexRenew Education Center & Meeting Space \, 1800 Limerick Street
SEQUENCE:6
STATUS:CONFIRMED
SUMMARY:AlexRenew Pumping Station Ribbon Cutting
TRANSP:OPAQUE
UID:5ab27c1b-6566-4bb1-a32e-41456d7312a4
X-ALT-DESC;FMTTYPE=text/html:Imported on Jun 26\, 2026\, 4 days before the
  event.<br />To verify info please see <a href="https://apps.alexandriava
 .gov/Calendar/Detail.aspx?si=63177">https://apps.alexandriava.gov/Calenda
 r/Detail.aspx?si=63177</a><br />\n<br />Join the City of Alexandria and A
 lexRenew for the christening and ribbon-cutting of the updated and rehabi
 litated pump station at the heart of AlexRenew?s wastewater treatment ope
 rations.\n<br />\n<br />Location: AlexRenew Education Center &amp\; Meeti
 ng Space \, 1800 Limerick Street\n<br />Contact Person: Bethany Latham\n<
 br />Contact Phone: 703.283.9813\n<br />Contact Email: bethany.latham@ale
 xrenew.com\n<br />Tags: Sanitary Sewer System\, Stormwater\, Water
X-COA-DTSTAMP:20260618T205027Z
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:AlexRenew Pumping Station Ribbon Cutting: Please visit website
  to confirm time\, location\, etc.
DURATION:PT30M
REPEAT:2
TRIGGER:-PT30M
END:VALARM
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Stormwater
CATEGORIES:Streams
CATEGORIES:T&ES Events
DESCRIPTION:Imported on Jun 26\, 2026\, 23 days before the event.\nTo veri
 fy info please see https://apps.alexandriava.gov/Calendar/Detail.aspx?si=
 63146\n\nThe City of Alexandria invites community members to attend a com
 munity meeting that presents the 60% Design plans for the Taylor Run Infr
 astructure Stabilization Project on Monday\, July 20 from 6:30 - 8 p.m. a
 nd share how the designs have evolved based on prior analysis and communi
 ty input. Register for zoom at link below. \n \nStaff will share key elem
 ents of the proposed improvements\, including outfall protection\, landsc
 ape palette\, and tree protection plan. \n\nAdditional information can be
  found on the project webpage linked below.\n\nFor reasonable disability 
 accommodation\, contact Camille Liebnitzky at camille.liebnitzky@alexandr
 iava.gov. \n \nIf you prefer communication in another language\, free int
 erpretation and translation services are available to you. Please email L
 anguageAccess@alexandriava.gov or call 703.746.3960\n\nLocation: 2900 Bus
 iness Center Drive\nContact Person: Camille Liebnitzky\nContact Phone: 70
 3.746.4089 \nContact Email: camille.liebnitzky@alexandriava.gov\nTags: St
 ormwater\, Streams\, T&ES Events\n\nWeb resources:\n\nRegistration Zoom L
 ink\nhttps://alexandriava.zoom.us/webinar/register/WN_6rgE_zk9Qe66jFsgSd7
 ntQ\n\nTaylor Run Infrastructure Stabilization Project\nhttps://www.alexa
 ndriava.gov/capital-projects/project/taylor-run-infrastructure-stabilizat
 ion-project\n
DTEND:20260721T000001Z
DTSTAMP:20260626T200106Z
DTSTART:20260720T223000Z
LOCATION:2900 Business Center Drive
SEQUENCE:10
STATUS:CONFIRMED
SUMMARY:Taylor Run 60% Design Community Meeting
TRANSP:OPAQUE
UID:0bc5b61c-6d85-472f-9f19-a95654abd0b6
URL:https://alexandriava.zoom.us/webinar/register/WN_6rgE_zk9Qe66jFsgSd7ntQ
X-ALT-DESC;FMTTYPE=text/html:Imported on Jun 26\, 2026\, 23 days before th
 e event.<br />To verify info please see <a href="https://apps.alexandriav
 a.gov/Calendar/Detail.aspx?si=63146">https://apps.alexandriava.gov/Calend
 ar/Detail.aspx?si=63146</a><br />\n<br />The City of Alexandria invites c
 ommunity members to attend a community meeting that presents the 60% Desi
 gn plans for the Taylor Run Infrastructure Stabilization Project on Monda
 y\, July 20 from 6:30 ? 8 p.m. and share how the designs have evolved bas
 ed on prior analysis and community input. Register for zoom at link below
 . \n<br /> \n<br />Staff will share key elements of the proposed improvem
 ents\, including outfall protection\, landscape palette\, and tree protec
 tion plan. \n<br />\n<br />Additional information can be found on the pro
 ject webpage linked below.\n<br />\n<br />For reasonable disability accom
 modation\, contact Camille Liebnitzky at camille.liebnitzky@alexandriava.
 gov. \n<br /> \n<br />If you prefer communication in another language\, f
 ree interpretation and translation services are available to you. Please 
 email LanguageAccess@alexandriava.gov or call 703.746.3960\n<br />\n<br /
 >Location: 2900 Business Center Drive\n<br />Contact Person: Camille Lieb
 nitzky\n<br />Contact Phone: 703.746.4089 \n<br />Contact Email: camille.
 liebnitzky@alexandriava.gov\n<br />Tags: Stormwater\, Streams\, T&amp\;ES
  Events<br>\n<a href="https://alexandriava.zoom.us/webinar/register/WN_6r
 gE_zk9Qe66jFsgSd7ntQ">Registration Zoom Link</a><br>\n<a href="https://ww
 w.alexandriava.gov/capital-projects/project/taylor-run-infrastructure-sta
 bilization-project">Taylor Run Infrastructure Stabilization Project</a><b
 r>\n
X-COA-DTSTAMP:20260626T200106Z
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Taylor Run 60% Design Community Meeting: Please visit website 
 to confirm time\, location\, etc.
DURATION:PT30M
REPEAT:2
TRIGGER:-PT30M
END:VALARM
END:VEVENT
END:VCALENDAR
