DESCRIPTION:To verify info please see https://apps.alexandriava.gov/Calend
 ar/Detail.aspx?si=63756\n\nFollowing previous community discussions and f
 urther project evaluations\, the City has significantly reduced the exten
 t of the proposed engineered improvements and anticipated construction im
 pacts. The revised design reflects these changes and will be presented at
  the upcoming meeting. \n\nThe updated 60% design plans and accompanying 
 report are now available for review on the City's project website. Commun
 ity members are encouraged to review the materials before the meeting. \n
 \nLocation: 2900 Business Center Drive\nContact Person: Camille Liebnitzk
 y\nContact Phone: 703.746.4089\nContact Email: camille.liebnitzky@alexand
 riava.gov\nTags: Environment\, Stormwater\, Streams\, T&ES Events\n\nWeb 
 resources:\n\nCity Website\nhttps://www.alexandriava.gov/capital-projects
 /project/taylor-run-infrastructure-stabilization-project\n\nTaylor Run In
 frastructure Stabilization  60%  Community Feedback Form\nhttps://app.sma
 rtsheet.com/b/form/01a1c5f3c2f57d93849762c6ecfa33c6\n
DTEND:20261120T010000Z
DTSTAMP:20261112T155738Z
DTSTART:20261119T233000Z
LOCATION:2900 Business Center Drive
SEQUENCE:7
STATUS:CONFIRMED
SUMMARY:Taylor Run 60% Design Community Meeting
TRANSP:OPAQUE
UID:218a3bea-9c45-48e5-b7cb-e57087d7a123
URL:https://www.alexandriava.gov/capital-projects/project/taylor-run-infra
 structure-stabilization-project
X-ALT-DESC;FMTTYPE=text/html:To verify info please see <a href="https://ap
 ps.alexandriava.gov/Calendar/Detail.aspx?si=63756">https://apps.alexandri
 ava.gov/Calendar/Detail.aspx?si=63756</a><br />\n<br />Following previous
  community discussions and further project evaluations\, the City has sig
 nificantly reduced the extent of the proposed engineered improvements and
  anticipated construction impacts. The revised design reflects these chan
 ges and will be presented at the upcoming meeting. \n<br />\n<br />The up
 dated 60% design plans and accompanying report are now available for revi
 ew on the City?s project website. Community members are encouraged to rev
 iew the materials before the meeting. \n<br />\n<br />Location: 2900 Busi
 ness Center Drive\n<br />Contact Person: Camille Liebnitzky\n<br />Contac
 t Phone: 703.746.4089\n<br />Contact Email: camille.liebnitzky@alexandria
 va.gov\n<br />Tags: Environment\, Stormwater\, Streams\, T&amp\;ES Events
 <br>\n<a href="https://www.alexandriava.gov/capital-projects/project/tayl
 or-run-infrastructure-stabilization-project">City Website</a><br>\n<a hre
 f="https://app.smartsheet.com/b/form/01a1c5f3c2f57d93849762c6ecfa33c6">Ta
 ylor Run Infrastructure Stabilization  60%  Community Feedback Form</a><b
 r>\n
X-COA-DTSTAMP:20261112T155738Z